After 2 months of prep, I now have my 4' X 12' bench, cloth cabinet w/fold out table, epoxy "hot box", Sticky Stuff adjustable pump, Wiss scisors, cutting wheel, hot wire saw, and most other things needed. I do want to get a Fein tool as soon as possible. I am orderig my chapter 4-7 kits through AC Spruce tomorrow. I do need to drive to AC spruce east (ony 2.5 hr drive) to pick up my MGS slow hardener. I found out that it cant be shipped due to the DOT hazardous materials laws. It would have to be shipped truck freight at a cost of over $175 for shipping 2 quarts!!! OUCH! I'm glad I live close enough to AC spruce east. My goal is to start pumping epoxy by the end of this month, and have chapter 7 finished by the end of the year. I am very excited to start building. My wife is getting annoyed with my talking about it 24/7. My digital camera is going to get a workout, as I will be taking thousands of pictures and keeping detailed notes. I want to put a web page together, but don't know ANYTHING about how to do it. Any advice??? I will be posting regulary when I begin construction. As always, any advice and tips are welcome.
Thanks in advance,