Jump to content

overtorque

Members
  • Posts

    19
  • Joined

  • Last visited

Posts posted by overtorque

  1. Hi there!

     

    My question concerning the long-EZ. When I checked my controls, I found some bolts with "head down". I believed in aircraft the bolts must be head up.

     

    I opened the plan and on chapter 19 P16, I can see the bolt of the front pushrod (CS129) head down. I suppose that Rutan must have a good reason to do this choice.

     

    If anyone can give me the reason, I will be happy to know!

     

    Thanks for help

  2. Hi all,

     

    This thread made me worried about my long EZ elevators. They have just been paint and I didn't take into account the importance of rebalancing the elevator. This morning, I removed the right hand elevator and I weighed it: 3.9 lbs :envy: . I checked the balance: out of range:mad: :mad:

     

    I removed all the paint, and now the weight is 3.46lbs, the balance is coming close to 10°..... I plan to paint again the elevator with a very thin layer.

     

    One question is coming to me: in order to adjust balance, I would probably add lead, this lead should be outboard. Could you tell me if adding weigh on CS10 is a good idea? If not, where can I add lead?

     

    Thank you for your help!

    OT

  3. Hi there!

     

    Modification is working, now the elevator can move completly without the new PTB entering in contact with any obstacle...

     

    Here below some picture of the new part that I riveted in the tube of the canard.

     

    What do you think about this modification? In my mind, there is no problem with safety...

     

    OT

    Posted ImagePosted Image

     

     

    Posted ImagePosted Image

  4. Good evening, many thanks for all your advices

     

    I spent the afternoon brainstorming a solution... I don't want to work several days on this problem.

     

    Now, it is clear that put a part of aluminium in the left side of the CS2 where I could screw the PTB is not a good idea because the elevator cannot move normally.

     

    So, one of my friend cut into a aluminium piece a new PTB. On the elevator tube, there is just enough room to put this new part with 2 or 3 rivets.

     

    I hope to be able to post one pic tomorrow, Id like to have your opinion about this modification.

     

    OT

  5. Hi Kent,

     

    Thank you for your informations, I didn't know this system. Do you have it on your plane? Are you happy with it? This afternoon , I will check on the plane what the will be the best solution.

     

    Many thanks for your help!

     

    OT

  6. I have KX 125, KY97A...

     

    Of course, if I change the radio with becker or something like that, I will have the correct space.... But it is a solution out of range with my money ;)

    No room to change the place of the pitch trim...

     

    another idea is maybe to move aft the complete instrument panel, I will check tomorrow!

     

    OT

  7. Hello,

     

    I'm still working on my instrument panel, yesterday, the wiring was completed, so I decided to put up the canard to check if there was no contact against wire. I was very desapointed to discover that the "PTB" (the part where you have the pitch trim springs fitted, on the left elevator) jamed the normal movement of the pitch by touching the radios case.:mad:

     

    Ok, I have 2 solutions:

     

    -redo all my instrument panel, that really means a lot of work

    -move the famous PTB on the other side of CS2 by inserting a piece of aluminium in order to move away the PTB of 1/2 inch.

     

    What do you think about this last idea? Is it change something with safety? I believe no, the springs will be closer the frame and there is enough room to permit the PTB moving completly.

     

    I would be happy to take advantage of your experience.

     

    Overtorque

  8. Hi everybody,

     

    My long-EZ is fitted with a O 235 H2C, the cowls are the basic one (P51 scoop).

    I can display the temperature for 2 head cylinders and I don't know where it is preferable to fit the senders... Which cylinders are supposed to be the hotest?

     

    Thanks

     

    OT

  9. Correct me if I'm wrong, but in Europe, I believe you cannot build a long-EZ with the single TERF CD.... You need an original set of plan combined with a serial. Without this number, no registration! Without registration, no flight :cool:

     

    OT

  10. Many thanks for all input.

     

    Now I have some bases to start drawing my electrical system. If anyone has one to share it would be welcome :D

    One question for Miketdrew: What would happen if a failure occur with the Anywhere Map Control Vision EXP DC? Do you lose all the electrical system or just the offending circuit? :confused: It seems to be very easy to wire....

     

    OT

  11. Hi there,

     

    I started brainstorming: I want to upgrade the instrument panel, that's why I need to upgrade the electrical system of my lez.

     

    Unfortunatly I don't have the technical documentation of my future equipements and I will be happy if anyone knows which breaker I must fit to protect the following boxes:

     

    little efis Dynon D10A

    audio panel GMA 240

    VHF/NAV KX125

    VHF KY97A

    transponder FILSER TRT800

    GPS garmin 496

    Auto pilot Dynon (AP74+servos)

     

    Any help will be much appreciated :)

     

    OT

  12. Hi,

     

    My first post was a little bit incomplete...;)

    About the engine overhaul: After purchase, I wanted an accurate idea about the state of the engine. I opened it and I the situation was the following:

    - cam shaft pitted

    - tappets pitted

    - valves pitted

    - cylinders cracked: 3 with 8mm and the last one with 43mm

     

    As I wish to fly a lot and far, I decided to have my engine overhauled.

     

    About the reason to explain the cracked cylinders, I suppose that the previous owner use to perform high speed descent with throttle fully aft.... the plane is CHT sensor equipped, so it make me think about a fast thermic change that would damage cylinders.

     

    Now, I'm working on new electric installation and new instrument panel, I will post some questions about wiring and breakers protection.

     

    Overtorque

  13. Hi, from Europe

     

    I was keen on canard for a long time.( 15years :cool: ). Few months ago I decided to cross the line and I bought a long ez. I needed to overhaul the engine due to cracked cylinders :sad:

     

    Today, engine is ready to work, cokpit has been repaint but I need to rebuilt the electric circuit.... there is work left! :D

     

    I hope to get a lot of advices from forum.

     

    Overtorque

×
×
  • Create New...

Important Information